Conveyancing & Developer Protocol · Spanish Off-Plan Acquisitions
Spain has a statutory regime for advance payments on homes under construction: from the building licence, the developer must guarantee the return of the advances, applicable taxes and legal interest through either an insurance bond or a joint and several bank guarantee, and must collect the money through a special bank account. That protection has conditions and limits, so check the guarantee, the account and the occupation paperwork for your specific unit before you pay.
Off-Plan Purchase Checkpoints (Reviewed October 2026)
1. The 6-Stage Off-Plan Acquisition Roadmap
A Spanish off-plan purchase generally follows six stages. Details vary by project, so check this framework against your own contract:
Stage 1: Reservation Agreement (Documento de Reserva)
Before payingYou select a unit and sign a reservation document with a holding deposit. Amounts and periods are set by each developer; there is no statutory figure. The agreement should state the amount, whether and for how long the price is fixed, and whether and when the deposit is refundable.
Legal Effect: A deposit can operate as arras (señal) under Civil Code art. 1454, so withdrawing may cost you the deposit. Ask whether the deposit is covered by the same guarantee and special account as later advances, and have a lawyer read the agreement first.
Stage 2: Independent Legal Due Diligence
Before the contractIndependent legal advice is strongly recommended before you sign, although the law does not generally make it mandatory. A typical review covers:
- The Land Registry position of the plot or unit (Nota Simple): owner, charges and any mortgage. It is informational and valid as of its issue date.
- The building licence (licencia de edificación) and approved project. The guarantee obligation runs from the grant of the licence.
- The guarantee for advance payments and the designated bank account (see Stage 4).
- The draft contract and specification document, against the information the developer must provide to buyers.
Stage 3: Private Purchase Contract (Contrato Privado de Compraventa - PPC)
At signingThe PPC is the binding contract before the public deed. The amount payable on signing is whatever it says; it should itemise the reservation, each advance, VAT and the balance.
Contract points to check: Where advances are agreed, the contract must state that the developer will return them, with taxes and legal interest, if construction does not start or finish in time or the occupation document is not obtained, and must name the insurer or bank and the account. Review also the delivery date, extension terms and the specification (Memoria de Calidades).
Stage 4: Staged Payments & Guarantee Documents
During constructionPayment stages and percentages are agreed in the contract and vary by project; there is no standard schedule.
What the law requires: Advances must go into a special account at a credit institution, kept separate from the developer’s other funds. At contract signing the developer must give you a guarantee document individualised to the amounts to be advanced (an individual policy identifying the property, or a bank guarantee covering advances, taxes and legal interest). Confirm it matches your payment schedule.
Stage 5: Completion of Works, Occupation Paperwork & Handover Inspection
Pre-completionIn Andalucía, Ley 7/2021 (LISTA) provides for occupation of completed works covered by a prior licence to be handled by responsible declaration, accompanied by the final works certificate. The document is often still called a first occupation licence.
- Ask which occupation document applies, who files it, and obtain a copy. Check whether delivery and final payment are conditional on it.
- Arrange an independent inspection (Section 5).
Stage 6: Notary Completion (Escritura Pública) & Registration
CompletionThe advance-payment guarantee is generally cancelled when the applicable occupation or use requirement has been validly satisfied—by issuance of the relevant licence or equivalent document, or by valid filing of a responsible declaration where that route applies—and the developer has evidenced delivery of the home to the buyer. Check the individual guarantee and the local procedure; the exact timing and documents should be checked against the individual guarantee. Your lawyer then registers the deed.
Remaining costs: VAT on the balance, Andalucía AJD (see FAQ), notary and registry fees, legal and administrative fees and any mortgage costs. On a first sale, costs the law assigns to the seller (such as the new-build declaration, horizontal division or cancelling the developer’s loan) should not be passed to you. Ask for a written cost estimate.
2. Statutory Liability and Warranty Regime Under Spain’s Building Act (LOE)
Under Spain’s Building Act (Ley 38/1999 de Ordenación de la Edificación - LOE), those involved in a building project may be liable for specified material damage caused by construction defects during set periods. These run from the signed acceptance of the works (acta de recepción), not from your handover date, and each defect is assessed for scope, causation and proof. Claims generally prescribe two years after the damage appears.
Finishing & Completion Elements
Material damage caused by defects in execution affecting finishing or completion elements. The guarantee may be replaced by a 5% retention. It does not automatically cover every cosmetic issue.
Habitability Requirements
Material damage from defects in construction elements or installations that breach statutory habitability requirements.
Structural Damage (Seguro Decenal)
Material damage to foundations, supports, beams, slabs, load-bearing walls or other structure that directly compromises stability. For housing this is the guarantee the LOE makes compulsory, with exceptions such as an individual self-builder of a single home.
For buildings within the LOE, a public deed declaring a new work generally cannot be authorised or registered without evidence of the guarantees required by law, subject to statutory exceptions. The promoter is jointly liable with the other relevant building agents for material construction damage within the scope of the LOE.
3. Mortgage Financing for Non-Residents: What to Expect
Construction can take a long time, and a lender’s assessment depends on your circumstances and the valuation of the finished home. Non-resident terms differ between banks, and some lenders may offer a lower loan-to-value than for residents. Availability depends on income, assets, currency, debt, property type and valuation.
Start Early, Confirm in Writing
Speak to lenders before committing to a payment schedule. Early indications are not binding offers.
Valuation & the FEIN Binding Offer
Under Ley 5/2019 the lender must give you the European Standardised Information Sheet (FEIN) at least ten calendar days before signing. It binds the lender for its stated validity period (at least ten days); variable rates still follow the agreed reference-rate mechanism.
4. Developer & Project Due Diligence: Checks to Discuss With Your Lawyer
Spanish law prescribes no fixed checklist for the buyer’s lawyer, but these checks are commonly recommended. Agree the scope for your development.
Corporate, Title & Planning Checks
- • Mercantile Registry: the developer’s corporate history, directors and filed accounts (Registro Mercantil).
- • Land Registry: ownership of the land, existing charges and how any developer loan (préstamo promotor) is allocated to each unit.
- • Planning: the building licence, approved project and any conditions attached to it.
Compliance Certificates & Payment Safeguards
- • Tax and Social Security certificates: they can show the developer’s compliance status on the date issued. They do not rule out future assessments, creditor claims or attachments.
- • Guarantee and account: verify the insurance bond or bank guarantee and the designated special account for advance payments. Do not assume it is an escrow account or that the cover is a bank guarantee.
5. Handover Inspection (Snagging): What a Technical Survey Can and Cannot Cover
An independent technical professional (an arquitecto técnico, aparejador or architect) can inspect the property and report defects within the scope you agree. Specialist testing should be commissioned separately.
Systems, Installations & Finishes
Typical scope: visible finishes and joinery, doors and windows, basic operation of plumbing, electrics and air conditioning, and conformity with the specification.
Waterproofing, Drainage & Acoustics
Check terraces, drainage and signs of moisture. Record observations in writing and ask the developer to acknowledge them at handover.
Conveyancing & Developer Legal FAQ
Frequently Asked Questions on Off-Plan Purchases
Explore Essential Buying Guides & Market Insights
Sources & Official References
Official pages used for this guide. Check the current text before relying on any rule, rate or deadline.